The Pavement Directory

Parking Lot Striping Cost Calculator

Re-striping a parking lot costs about $4 to $10 per stall ($0.20 to $0.60 per linear foot of line), so a 100-stall lot runs roughly $400 to $1,000. ADA stalls, stencils, a new layout and two coats cost more.

  • Free, no signup
  • Results on submit
  • Planning estimate, not a quote

How much does it cost to stripe a parking lot?

Re-striping an existing layout costs about $4 to $10 per stall, or $0.20 to $0.60 per linear foot of 4-inch line. A 100-stall lot runs about $400 to $1,000.

A new layout costs $5 to $15 per stall. ADA stalls add about $40 to $60 each for the aisle and symbol, and small jobs carry a minimum charge. Paint for 100 single-line stalls is about 5.6 gallons per coat.

Estimate Your Striping Cost, Line Footage and Paint

Complete the inputs, then calculate. If an assumption changes, submit again to refresh the documented result.

You can outline the area on a satellite map when you request quotes, and the form works out an estimated square footage. See how it works.

What this estimate covers

Enter the number of stalls, or just the lot area, and this calculator returns three things: a professional cost range, the linear feet of line to paint, and how many gallons of paint to buy in each color. It works for a property manager checking a bid and for a striping contractor building one.

Prices come from the national planning ranges in our parking lot striping cost guide: $4–$10 per stall to re-stripe existing lines, $5–$15 per stall for a new layout, and $40–$60 for each accessible stall's aisle and symbol. Small lots usually hit a minimum charge, so the calculator applies one. Treat the result as a range to check bids against, not a quote.

For a detailed bid, open the Itemized takeoff section. It adds measured runs of double yellow, stop bars, crosswalks, curb painting, hatching and line removal, keeps route length separate from painted length, and downloads the full quantity sheet as a CSV for a spreadsheet or bid form.

Not sure how many stalls the lot holds or how many must be accessible? The parking lot capacity calculator estimates stalls from the area and links straight here with the count filled in, and the ADA parking space calculator gives the federal minimum.

What to Count in a Striping Takeoff

A takeoff is the count and measurement behind a striping price. Two bids only compare when both priced the same items, so count them yourself first. The Itemized takeoff section of the calculator adds measured runs and exports everything to a CSV for a bid sheet.

Keep plan-specific colors, widths and patterns with the takeoff. Counts are quantities, not proof of code compliance.
ItemUnitHow to count it
Standard stallsEachOne stall line per stall, about 18 ft; double (hairpin) lines about 38 ft
Accessible (ADA) stallsEachStall lines plus an access aisle (about 60 ft of outline and hatching) and a symbol; signs priced separately
Arrows, words, numbersEachCount every stencil; note size and color
Single linesLinear ftDrive lanes, fire lanes, row ends: measure the route
Double yellowRoute ftMeasure once; it is painted twice
Stop bars and crosswalksLinear ftTotal length of the bars, with their width (often 12 in)
Curb paintingCurb ftLength by color (red fire lane, yellow loading)
Line removalLinear ftOld lines to grind or black out; priced separately

Not sure how many stalls the lot holds? The parking lot capacity calculator estimates it from the area, and the ADA parking space calculator gives the minimum accessible count.

How Much Paint Per Linear Foot?

A gallon of traffic paint covers about 320 feet of 4-inch line at a normal 15-mil wet film, and 300 to 400 feet depending on thickness and pavement texture. Wider lines use paint in proportion to their width.

At 320 ft of 4-inch line per gallon. Check the product data sheet for its film thickness and coverage.
Line widthFeet per gallonGallons per 1,000 ft
4 in320 ft3.1 gal
5 in256 ft3.9 gal
6 in213 ft4.7 gal
12 in107 ft9.4 gal

Faded lines over old paint often need two coats, which doubles the paint. Fresh sealcoat soaks up the first coat, so many crews stripe new layouts twice.

Re-Stripe vs. New Layout

A re-stripe paints over lines that are still visible, so it is mostly paint and labor. A new layout, after paving or sealcoating covers the old lines, adds measuring and snapping the layout, which is why it costs more per stall. It is also the time to fix traffic flow or add accessible stalls.

Ask each contractor to list stalls, ADA stalls, stencils, coats and paint type separately. The parking lot striping cost guide covers thermoplastic and ADA pricing, and the striping contractor checklist lists what a complete bid should include.

How this calculator works

Stalls become line feet. Each stall gets one stall line the length of the stall, about 18 ft. Double (hairpin) lines use about 38 ft per stall. Each accessible stall adds about 60 ft of access-aisle outline and hatching plus a symbol.

Lot area becomes stalls. If you only know the area, the calculator uses the same typical 90° layout as our parking capacity calculator, with the federal minimum of accessible stalls inside the total.

Line feet become paint. A gallon covers about 320 ft of 4-inch line per coat (300–400 is typical). Wider lines, such as 12-inch stop bars or curb faces, count in proportion to their width. Paint is rounded up to whole gallons for each color.

Counts become a cost range. Stalls are priced per stall, accessible stalls per stall, other lines per foot ($0.20–$0.60), and arrows or stencils per item. A small-job minimum of about $250 – $750 applies when the total comes in under it.

The takeoff stays auditable. Every measured item keeps its length, width, line count and color, and the CSV lists them line by line with paint by color.

Formula used

  • Stall line ft = Stalls × Stall line length (~18 ft; ~38 ft for double lines)
  • Line equivalent ft = Length × Number of lines × (Line width in ÷ 4)
  • Paint (gal) = Total line equivalent ft × Coats ÷ ~320 ft per gal
  • Cost = Stalls × $4–$10 + ADA stalls × $40–$60 + Other lines × $0.20–$0.60/ft

Parking lot striping cost by number of stalls

National planning ranges from our striping cost guide, single-line stalls, one coat, with a $250 – $750 small-job minimum. ADA stalls, stencils and specialty markings are extra.
StallsRe-stripeNew layoutStall linePaint (1 coat)
25 stalls$250 – $750$250 – $750450 ft1.4 gal
50 stalls$250 – $750$250 – $750900 ft2.8 gal
100 stalls$400 – $1,000$500 – $1,5001,800 ft5.6 gal
200 stalls$800 – $2,000$1,000 – $3,0003,600 ft11.3 gal
400 stalls$1,600 – $4,000$2,000 – $6,0007,200 ft22.5 gal

Frequently asked questions

How much does it cost to stripe a parking lot?

Re-striping an existing layout commonly runs about $4 to $10 per stall, so a 100-stall lot is roughly $400 to $1,000. A new layout runs $5 to $15 per stall. Small lots usually pay a minimum charge of a few hundred dollars because the crew's setup costs the same either way.

How much does parking lot striping cost per linear foot?

About $0.20 to $0.60 per linear foot of standard 4-inch line with regular traffic paint. Wider lines cost more in proportion, so a 12-inch stop bar is roughly three times a 4-inch line. Thermoplastic costs two to four times as much as paint but lasts much longer.

How much paint do I need to stripe a parking lot?

A gallon covers about 320 ft of 4-inch line per coat. A single-line stall uses about 18 ft of line, so 100 stalls need about 5.6 gallons per coat, plus blue paint for accessible stalls and white for arrows. Faded lots often need two coats.

How many linear feet of striping is a parking space?

About 18 ft per stall with single lines, because neighboring stalls share a line and each line runs the stall depth. Double (hairpin) lines are about 38 ft per stall. Add row-end lines, drive lanes and fire lanes separately.

How much does it cost to stripe an ADA parking space?

Plan on about $40 to $60 or more per accessible stall for its lines, the hatched access aisle and the painted symbol. Required signs and posts are extra. Repainting does not by itself make a lot compliant; counts, dimensions, slope and signs must follow the ADA Standards and local code.

How much should I charge to stripe a parking lot?

Contractors usually price by the stall for re-stripes and by the foot for long lines, with set prices for ADA stalls, arrows and stencils, plus a minimum for small jobs. Enter your own counts, paint coverage and price above to check material, then compare your per-stall price with the ranges in the table.

What is a parking lot striping takeoff?

A takeoff is the itemized count and measurement behind a striping price: stalls, accessible stalls, stencils, linear feet of line by color and width, crosswalks, curbs and line removal. The itemized takeoff section of this calculator records each item and exports a CSV for a bid sheet.

How do I measure double yellow line in a takeoff?

Measure the route once and set the line count to two. 300 ft of double yellow is 300 ft of route and 600 ft of painted line. The calculator keeps both so the measurement and the paint quantity are never confused.

How often should a parking lot be re-striped?

Most lots need re-striping every one to three years, sooner on busy or sunny lots where paint wears fast. Re-striping is also the last step after sealcoating, which covers the old lines.

Need a contractor for the work?

Use the estimate to ask better questions, then find the companies in your market who do this kind of work.

For property owners

Looking for a pavement contractor?

Use The Pavement Directory to search asphalt, concrete, sealcoating, striping, ADA access, and pavement maintenance contractors by service and location. Always verify license, insurance, references, and written scope before hiring.

Search contractors

Are you a pavement contractor?

Contractors can add or claim a company profile to help property owners find pavement professionals by service, location, and specialty.

Before you hire: Costs vary by region, project size, access, materials, labor, traffic control, disposal, site conditions, and scope. Use written proposals and contractor-specific pricing before making decisions.