For contractors and estimators
Find a hot mix plant within haul range
Search a national directory of hot mix asphalt plants by how long the haul takes, not by how the map looks. Built for the question estimators actually ask before they bid a job.
- Mappable plants
- 3,183
- States covered
- 52
- No account needed
- Free
Enter the city your job is in, or use your location if you are already on site. Results are sorted by distance, closest first.
Why haul time, not distance
Hot mix is a perishable material
Every other directory sorts suppliers by name or by state. Neither answers the question that decides whether a plant is usable on a given job.
Mix cools on the truck
Hot mix leaves the plant around 300°F and has to be placed and compacted before it drops to roughly 185°F. Distance is really a temperature budget.
Cycle time drives the day
A crew paving continuously needs trucks returning steadily. Doubling the haul does not just add time — it can halve how much you place in a shift.
Price rarely beats proximity
A cheaper ton 90 minutes out usually costs more once you add trucking, waiting time, and the risk of a load arriving too cool to use.
Where this data comes from, and what it misses
Plant records are built from US EPA Facility Registry Service data for NAICS 324121 (asphalt paving mixture and block manufacturing). That registry tracks air permits rather than businesses, which shapes what you see here.
It knows: that a permitted asphalt plant exists at a location, and roughly who holds the permit. It does not know: phone numbers, hours, mix designs, seasonal shutdowns, or — most importantly — whether a plant sells to outside contractors at all. Plenty are captive to a parent company.
Coverage is also uneven, because states report differently. A thin result in one state reflects that state's reporting, not the number of plants operating there. Treat this as a starting shortlist to call against, not a verified supplier list.
