How much gravel do I need?

Multiply length × width × depth in feet and divide by 27 to get cubic yards. Multiply cubic yards by about 1.4 tons per yard to get tons.

A 20 × 20 ft area 4 inches deep needs about 4.9 cubic yards, or 6.9 tons of crushed stone. One ton covers roughly 77 ft² at 3 inches deep.

Stone weight varies by type and supplier. Use the supplier’s weight per yard when you have it.

Calculate How Much Gravel You Need

Adjust any field to see the estimate recalculate. Keep local rates and actual site conditions in view.

What this estimate covers

Gravel is measured by volume but usually sold by the ton, and the conversion depends on the stone. This gravel calculator takes a rectangle, a circle or a known area, multiplies by the depth to get cubic yards, then uses the material's weight per yard to get tons. It also gives a truckload count, the bagged equivalent for small jobs and an optional material cost.

Each material fills in a typical loose weight: about 1.4 tons per cubic yard for crushed stone and pea gravel and 1.5 for crusher run. It also fills in a compaction and waste allowance you can see and change. Base materials with fines pack down when they are rolled, so they need more loose stone than the finished depth suggests. Your supplier's weight per yard is the number to trust, so enter it when you have it.

Building a gravel driveway or a base for asphalt? Most driveways are built in layers: a thicker base of crusher run, then a few inches of clean stone or a paved surface on top. Run the calculator once per layer. If the gravel is the base for new pavement, the asphalt calculator handles the hot-mix tonnage, and recycled asphalt millings covers millings as a cheaper surface.

How Much Does a Yard of Gravel Weigh?

A loose cubic yard of gravel or crushed stone weighs about 1.3 to 1.5 US tons (2,600 to 3,000 lb). The table lists the typical figure the calculator uses for each material, how many cubic yards that makes a ton, and how far a ton spreads at 3 inches deep.

Typical loose weights quoted by aggregate suppliers. Moisture, stone size and the quarry change them.
MaterialTons per yd³Lb per yd³Yd³ per tonFt² per ton at 3 in
Pea gravel1.4 (1.3–1.5)2,8000.7177
Crushed stone (#57 / clean stone)1.4 (1.3–1.5)2,8000.7177
Crusher run / road base1.5 (1.4–1.7)3,0000.6772
River rock1.35 (1.3–1.45)2,7000.7480
Sand (dry)1.35 (1.25–1.5)2,7000.7480
Asphalt millings (RAP)1.1 (0.9–1.2)2,2000.9198

Volume is what you measure, but weight is what you usually pay for. Two stones can fill the same cubic yard and weigh different amounts, so the same 4-inch driveway can need a different number of tons depending on the stone. Asphalt millings are the lightest common option. The recycled asphalt millings guide covers how they compare with gravel on a driveway.

How Much Gravel for a Driveway?

A gravel driveway that holds up is built in layers, not dumped in one pass. Take a single-lane driveway 12 feet wide and 100 feet long (1,200 ft²):

Before compaction allowance: 1.5 tons/yd³ for crusher run, 1.4 for crushed stone.
LayerDepthCubic yardsTonsOrder with allowance
Base: crusher run6 in22.233.338.3 tons (+15%)
Top: #57 crushed stone4 in14.820.721.8 tons (+5%)
Total10 in37.054.160.1 tons

That is about 5 loads at 15 tons per truck. The base carries the weight and should be spread in lifts and compacted. The top layer gives traction and sheds water. Soft or wet soil may need a thicker base or a geotextile fabric under it. Grading and drainage usually matter more than the stone itself, which is why a sitework and excavation contractor is often the right call for a new driveway.

If the plan is to pave over the gravel later, the same base works under asphalt. The asphalt calculator gives the hot-mix tonnage for the surface, and the asphalt driveway cost calculator estimates what paving it would cost.

Buying Gravel: Bags, Yards and Truckloads

  • Bags. Bagged stone usually comes in 0.5 ft³ bags, so a cubic yard is 54 bags. Bags make sense for a planter or a small path. Past about a cubic yard, bulk delivery is almost always cheaper.
  • By the ton or the yard. Quarries usually sell by the ton and landscape yards often by the yard. To compare, divide the price per yard by the tons per yard to get a price per ton.
  • Truckloads. Delivery is often a flat charge per load, with a minimum. A tandem dump truck commonly carries 10 to 15 tons, but legal weight limits and the truck decide. For bigger jobs, the trucking calculator works out how many trucks keep a crew busy.
  • Spreading. Ask for the load to be tailgate-spread if the driver can do it. It saves hours of wheelbarrow work on a long driveway.

How this calculator works

Area: length × width for a rectangle, π × radius² for a circle, or a total area you already know. Irregular areas can be split into rectangles and added together.

Volume: area × depth gives cubic feet; dividing by 27 gives cubic yards. Depth is the finished depth you want, entered in inches, feet or centimeters.

Weight: cubic yards × tons per cubic yard gives US tons. The material list fills in typical loose weights, and you can replace them with the supplier's figure.

Order quantity: the compaction and waste allowance is added on top and shown separately. The calculator adds nothing you can't see. Truckloads round up to whole loads at the capacity you enter.

Formula used

  • Area (ft²) = Length × Width or π × (Diameter ÷ 2)²
  • Cubic yards = Area (ft²) × (Depth in ÷ 12) ÷ 27
  • Tons = Cubic yards × Weight (tons per yd³)
  • Order = Tons × (1 + Allowance % ÷ 100)
  • Area one ton covers (ft²) = 27 ÷ Weight ÷ (Depth in ÷ 12)

Gravel needed by area and depth

Crushed stone at 1.4 tons per cubic yard, before any allowance. Cubic yards do not depend on the material; tons do.
Area2 inches3 inches4 inches6 inches
100 ft²0.6 yd³ · 0.9 t0.9 yd³ · 1.3 t1.2 yd³ · 1.7 t1.9 yd³ · 2.6 t
200 ft² (10 × 20)1.2 yd³ · 1.7 t1.9 yd³ · 2.6 t2.5 yd³ · 3.5 t3.7 yd³ · 5.2 t
400 ft² (20 × 20)2.5 yd³ · 3.5 t3.7 yd³ · 5.2 t4.9 yd³ · 6.9 t7.4 yd³ · 10.4 t
600 ft² (12 × 50)3.7 yd³ · 5.2 t5.6 yd³ · 7.8 t7.4 yd³ · 10.4 t11.1 yd³ · 15.6 t
1,200 ft² (12 × 100)7.4 yd³ · 10.4 t11.1 yd³ · 15.6 t14.8 yd³ · 20.7 t22.2 yd³ · 31.1 t
2,400 ft² (12 × 200)14.8 yd³ · 20.7 t22.2 yd³ · 31.1 t29.6 yd³ · 41.5 t44.4 yd³ · 62.2 t

Frequently asked questions

How do I calculate how much gravel I need?

Multiply length by width to get square feet, multiply by the depth in inches divided by 12 to get cubic feet, and divide by 27 to get cubic yards. Multiply cubic yards by the stone's weight per yard to get tons. A 20 × 20 ft area 4 inches deep is 4.9 cubic yards, or about 6.9 tons of crushed stone at 1.4 tons per yard.

How much does a yard of gravel weigh?

Most gravel and crushed stone weighs about 1.3 to 1.5 US tons (2,600 to 3,000 lb) per loose cubic yard. Pea gravel and #57 stone are usually close to 1.4 tons, and crusher run with fines is often around 1.5. River rock can be a little lighter, and wet material is heavier. Your supplier's figure for the exact product is the one to use.

How many cubic yards are in a ton of gravel?

At 1.4 tons per cubic yard, one ton of gravel is about 0.71 cubic yards. At 1.5 tons per yard it is about 0.67 cubic yards. Divide 1 by the material's weight per yard to convert.

How much area does a ton of gravel cover?

At 1.4 tons per cubic yard, one ton covers about 116 ft² at 2 inches, 77 ft² at 3 inches, 58 ft² at 4 inches and 39 ft² at 6 inches deep. Heavier material covers less per ton.

How much gravel do I need for a driveway?

A typical single-lane gravel driveway is 10 to 12 feet wide. A 12 × 100 ft driveway is 1,200 ft². A 4-inch top layer of crushed stone is about 14.8 cubic yards, or 20.7 tons. If the driveway also needs a 6-inch crusher run base, that layer is another 22.2 cubic yards, about 33.3 tons, before compaction.

How deep should driveway gravel be?

A new gravel driveway is usually built 8 to 12 inches deep in layers: a base of larger crushed stone or crusher run, then 3 to 4 inches of smaller stone on top. Refreshing an existing driveway usually needs only 2 to 3 inches of top stone. Soft or wet soil needs a thicker base, and sometimes a geotextile fabric under it.

How much extra gravel should I order?

For clean stone like pea gravel, #57 and river rock, about 5% covers spreading loss and uneven ground. Crusher run, road base and asphalt millings compact when rolled, so plan on roughly 15 to 25% more loose material than the finished depth. The calculator fills in a suggested allowance for each material, and you can change it.

Is it cheaper to buy gravel by the ton or by the yard?

Neither is cheaper on its own. It depends on the stone's weight per yard. Convert one price to the other: price per yard ÷ tons per yard = price per ton. Bulk delivery from a quarry or landscape yard is almost always cheaper than bags for anything over a cubic yard, but check the delivery charge and minimum load.

Need a contractor for the work?

Use the estimate to ask better questions, then find the companies in your market who do this kind of work.

For property owners

Looking for a pavement contractor?

Use The Pavement Directory to search asphalt, concrete, sealcoating, striping, ADA access, and pavement maintenance contractors by service and location. Always verify license, insurance, references, and written scope before hiring.

Search contractors

Are you a pavement contractor?

Contractors can add or claim a company profile to help property owners find pavement professionals by service, location, and specialty.

Before you hire: The Pavement Directory does not guarantee contractor performance, pricing, licensing, insurance, or availability. Business information may be submitted by contractors or gathered from public sources and should be independently verified before hiring. Always confirm licensing, insurance, references, scope of work, and written contract terms.