The Pavement Directory
Granite Construction Company logo

Granite Construction Company

Lehman-Roberts Plant 2

10204 Millington Arlington Road, Arlington, TN 38002

Before you haul

What to settle with the plant before trucks leave the yard.

Outside sales
Sells to outside contractors
Current hours
Mon-Fri 7:00 AM-4:00 PMPosted — confirm today’s loadout
Account
Confirm with plantAsk what a first order needs
Mix availability
Call plantName the mix and tonnage
Production schedule
Call plantChanges day to day
Minimum order
Confirm with plant
Payment methods
Confirm with plant
Truck access
See site and truck accessAccess notes on file

Plant notes

Lehman-Roberts of Memphis became part of Granite Construction in December 2023, together with Memphis Stone & Gravel. Granite said at the time that Lehman-Roberts ran seven asphalt plants in the Memphis area and northern Mississippi.

Call plant: (901) 774-4000

Production schedules, mix inventory and loadout conditions change day to day. Confirm the mix designation, tonnage and loadout time with the plant before you dispatch trucks.

Plant details

Operator
Granite Construction Company
Plant type
Fixed · hot mix asphalt
County
Shelby County
State DOT
Not yet checked against a DOT list
Address
10204 Millington Arlington Road, Arlington, TN 38002
GPS coordinates
35.33400, -89.71900
EPA air permits
TNSHL0004715700124
Details checked
October 24, 2026
Plant phone
(901) 774-4000
Outside sales
Sells to outside contractors

Ask for your mix by name, the day’s loading hours, the minimum load, and what a first-time account needs.

Plant hours
Monday-Friday 7:00 AM-4:00 PM Saturday closed Sunday closed
Seasonal schedule
Lehman-Roberts lists the plant open Monday-Friday 7:00 AM-4:00 PM on Google (checked October 2026). Call the main office to confirm production and last-load times before dispatching trucks.

Mixes and products

1 named by the operator
  • HMA · listed
  • RHMA · not listed, ask
  • Warm mix · not listed, ask
  • RAP · not listed, ask
  • DOT spec · not listed, ask

Hot mix asphalt (HMA)

  • Hot Mix Asphalt (HMA)

The operator’s own list, sorted into families by The Pavement Directory. Mix designs and production schedules change: confirm the exact mix designation and tonnage availability with the plant before dispatching trucks.

Price per ton

No price on file for Lehman-Roberts Plant 2 yet. Plant prices move with the liquid asphalt index and the quantity, so call for today's price — and if you have been quoted or bought here recently, you can add the price below.

Report a price you were quoted or paid

Been quoted a price by Lehman-Roberts Plant 2, or bought mix there recently? Share the price per ton you were quoted or paid. We check every report before it shows, and your name and email are never published.

Site and truck access

Google satellite imagery centred on the plant’s coordinates. Zoom out to see the roads in.

Gate address
10204 Millington Arlington Road, Arlington, TN 38002
GPS
35.33400, -89.71900

Truck access notes

Active asphalt plant with heavy truck traffic. Call (901) 774-4000 before arrival to confirm order status, mix availability, check-in procedure and last-load time.

5 other plants within a 30 min drive of Lehman-Roberts Plant 2, by road with typical traffic.

Route to 1. Millington Hot Mix Facility — 16 min (12 mi) by road, typical traffic.

Asphalt plants near Lehman-Roberts Plant 2, fastest drive first, with drive time and road miles and whether each sells to outside contractors.
Map number#PlantDrive
1Millington Hot Mix FacilityMillington, TN · permit record, not yet reviewed12 mi by road · Outside sales: UnconfirmedDirections from Lehman-Roberts Plant 2 to Millington Hot Mix Facility16 min
2Standard Construction CompanyMillington, TN · permit record, not yet reviewed12 mi by road · Outside sales: UnconfirmedDirections from Lehman-Roberts Plant 2 to Standard Construction Company16 min
3Frank Climer and Sons Asphalt Materials, Inc.Munford, TN · permit record, not yet reviewed13 mi by road · Outside sales: UnconfirmedDirections from Lehman-Roberts Plant 2 to Frank Climer and Sons Asphalt Materials, Inc.25 min
4Lehman-Roberts Plant 4Granite Construction Company · Memphis, TN21 mi by road · Outside sales: YesDirections from Lehman-Roberts Plant 2 to Lehman-Roberts Plant 429 min
5Standard Construction CompanyMemphis, TN · permit record, not yet reviewed22 mi by road · Outside sales: UnconfirmedDirections from Lehman-Roberts Plant 2 to Standard Construction Company29 min

Drive time and miles by road from Google, with typical traffic for the route. Rush hour, a plant queue and a loaded truck all add time, so allow for them before you commit trucks.

Plant intelligence

Lehman-Roberts Plant 2 is a hot mix asphalt plant in Arlington, Tennessee, run by Lehman-Roberts, part of Granite Construction since December 2023. Lehman-Roberts lists it on Google as one of its asphalt plants. Call (901) 774-4000 for orders. Call ahead to confirm mixes, pricing, account setup and loadout times.

All Granite Construction Company plant locations

Need the work done rather than the mix? Compare paving and pavement maintenance contractors serving the area.

Lehman-Roberts Plant 2: common questions

Does Lehman-Roberts Plant 2 sell asphalt to outside contractors?

Yes. Lehman-Roberts Plant 2 sells hot mix to outside contractors. Call (901) 774-4000 to confirm account, pickup and delivery terms before your first order.

What are Lehman-Roberts Plant 2's hours?

Monday-Friday 7:00 AM-4:00 PM Saturday closed Sunday closed. Lehman-Roberts lists the plant open Monday-Friday 7:00 AM-4:00 PM on Google (checked October 2026). Call the main office to confirm production and last-load times before dispatching trucks.

What asphalt mixes does Lehman-Roberts Plant 2 make?

Lehman-Roberts Plant 2 lists Hot Mix Asphalt (HMA). What runs on a given day depends on the plant's schedule, so confirm your mix when you order.

Where is Lehman-Roberts Plant 2?

10204 Millington Arlington Road, Arlington, TN 38002, in Shelby County.

What other asphalt plants are near Arlington?

The closest by road in this directory are Millington Hot Mix Facility in Millington (16 min (12 mi) by road), Standard Construction Company in Millington (16 min (12 mi) by road) and Frank Climer and Sons Asphalt Materials, Inc. in Munford (25 min (13 mi) by road), driving from Lehman-Roberts Plant 2 with typical traffic. Call ahead before you switch plants: the nearest one only helps if it will load your trucks.

Who operates Lehman-Roberts Plant 2?

Granite Construction Company operates Lehman-Roberts Plant 2.

Verified sources and corrections

Details checked October 24, 2026

Someone at The Pavement Directory checked this plant’s phone, hours and outside-sales policy against the operator on that date. It is not an endorsement of the plant or its mix.

Sources on this record

Record last updated October 24, 2026.

Suggest an edit

Run this plant, buy from it, or found a detail that is wrong or missing? Tell us and we will check it with the plant before the page changes. Prefer to write to us? Use the contact form.

Something about Lehman-Roberts Plant 2 wrong, out of date or missing? Tell us what you know. A person checks every edit with the plant before the page changes, and your name and email are never published.

Prices have their own form, in the Price per ton section above.

Confirm before you haul: Hours, mix availability, sales policy and DOT approvals change, sometimes week to week. Call the plant before you schedule trucks. The Pavement Directory is an independent directory and is not affiliated with Granite Construction Company.