
Granite Construction – Lee Vining Facility — Hot Mix Asphalt Plant
Hwy 120 East, Lee Vining, CA 93541
- Caltrans approved
- Outside sales
- Hot mix (HMA)
- Checked Sep 29, 2026
Before you haul
What to settle with the plant before trucks leave the yard.
- Outside sales
- Sells to outside contractors
- Current hours
- Call plantLoadout hours — confirm today’s
- Account
- Confirm with plantAsk what a first order needs
- Mix availability
- Call plantName the mix and tonnage
- Production schedule
- Call plantChanges day to day
- Minimum order
- Confirm with plant
- Payment methods
- Confirm with plant
- Saturday
- Confirm with plant
- Truck access
- See site and truck accessAccess notes on file
Plant notes
The Lee Vining facility serves the Eastern Sierra and Highway 395 corridor and operates in a high-elevation, highly seasonal paving market. Caltrans lists the plant as a continuous HMA facility with RAP capability. Granite also operates an onsite materials laboratory with active HMA testing certifications. Caltrans SIAD
Production schedules, mix inventory and loadout conditions change day to day. Confirm the mix designation, tonnage and loadout time with the plant before you dispatch trucks.
Plant details
Plant
- Operator
- Granite Construction Co.
- Plant type
- Fixed · hot mix asphalt
- Mixing method
- Continuous mix plant
- County
- Mono County
- Caltrans
- On the Caltrans approved-plant list
- Address
- Hwy 120 East, Lee Vining, CA 93541
- GPS coordinates
- 37.94042, -119.12617
- Website
- graniteconstruction.com
- Plant page
- The operator’s page for this plant
- Details checked
- September 29, 2026
Ordering and sales
- Plant phone
- (661) 387-7793
- Sales department
- On the plant line
- Outside sales
- Sells to outside contractors
Ask for your mix by name, the day’s loading hours, the minimum load, and what a first-time account needs.
Operations
- Plant hours
- Call plant for current production and loadout hours: (661) 387-7793.
- Loadout hours
- Call plant
- Seasonal schedule
- Production and loadout schedules may vary significantly with weather, seasonal paving demand and high-elevation project schedules. Call ahead to confirm current plant operation, mix availability and truck-loading times.
Mixes and products
- HMA · listed
- RHMA · not listed, ask
- Warm mix · not listed, ask
- RAP · listed
- DOT spec · listed
- Specialty · listed
Hot mix asphalt (HMA)
- Hot Mix Asphalt (HMA)
- Asphalt Concrete
- Type A HMA
Recycled asphalt (RAP) mixes
- RAP-Containing Asphalt Mixes
- Reclaimed Asphalt Pavement (RAP)
Agency and DOT specification mixes
- Caltrans Specification Asphalt Mixes
Specialty and custom mixes
- Custom Project-Specific Asphalt Mixes
The operator’s own list, sorted into families by The Pavement Directory. Mix designs and production schedules change: confirm the exact mix designation and tonnage availability with the plant before dispatching trucks.
Price per ton
No price on file for Granite Construction – Lee Vining Facility yet. Plant prices move with the liquid asphalt index and the quantity, so call for today's price — and if you have bought here recently, you can add what you paid below.
Report a price you paid
Site and truck access
Google satellite imagery centred on the plant’s coordinates. Zoom out to see the roads in.
- Gate address
- Hwy 120 East, Lee Vining, CA 93541
- GPS
- 37.94042, -119.12617
Truck access notes
Active asphalt production facility serving mountain and highway projects. Confirm plant status, mix, tonnage and scheduled pickup before dispatching trucks, especially during shoulder-season or winter conditions. Follow posted plant traffic and PPE requirements.
Nearby asphalt plants
1 other plant within a 1 hr 30 min drive of Granite Construction – Lee Vining Facility, by road with typical traffic.
Route to 1. Bishop Facility — 1 hr 4 min (66 mi) by road, typical traffic.
| Map number# | Plant | Drive | Road miles | Outside sales |
|---|---|---|---|---|
| 1 | Bishop FacilityGranite Construction Co. · Bishop, CA66 mi by road · Outside sales: YesDirections from Granite Construction – Lee Vining Facility to Bishop Facility | 1 hr 4 min | 66 mi | Yes |
Drive time and miles by road from Google, with typical traffic for the route. Rush hour, a plant queue and a loaded truck all add time, so allow for them before you commit trucks.
Plant intelligence
About Granite Construction – Lee Vining Facility
Granite Construction’s Lee Vining Facility is a continuous hot mix asphalt plant serving Mono County and the Eastern Sierra. The plant produces asphalt concrete for highway, municipal and commercial paving projects and is listed by Caltrans as an HMA continuous plant with RAP capability. The site also includes a materials laboratory supporting asphalt quality-control testing.
Areas served: Lee Vining · Mammoth Lakes · June Lake · Bridgeport · Benton · Crowley Lake · Mono County · Eastern Sierra · Highway 395 Corridor
More Granite Construction Co. plants
- Bishop FacilityBishop, CA · 1 hr 4 min (66 mi) by road
- French Camp FacilityFrench Camp, CA · 3 hr 40 min (162 mi) by road
- Granite ConstructionSacramento, CA · 3 hr 46 min (200 mi) by road
- Granite ConstructionPleasanton, CA · 4 hr 12 min (194 mi) by road
- Granite Construction Company-Santa Clara Asphalt FacilitySanta Clara, CA · 4 hr 42 min (220 mi) by road
- Coalinga FacilityCoalinga, CA · 4 hr 45 min (219 mi) by road
Plan the haul
- Asphalt tonnage calculatorTons to order before you call.
- Trucking calculatorCycle times and trucks for this haul.
- Asphalt plants near Lee ViningEvery plant within a haul of your site.
- Buying direct from a plantSmall loads, millings and price per ton.
Who lays the mix
Need the work done rather than the mix? Compare paving and pavement maintenance contractors serving the area.
Granite Construction – Lee Vining Facility: common questions
Does Granite Construction – Lee Vining Facility sell asphalt to outside contractors?
Yes. Granite Construction – Lee Vining Facility sells hot mix to outside contractors. Call (661) 387-7793 to confirm account, pickup and delivery terms before your first order.
How do I order asphalt from Granite Construction – Lee Vining Facility?
Call the sales department at (661) 387-7793. Have the mix, tonnage and pickup date ready, and ask what a first-time account needs.
What are Granite Construction – Lee Vining Facility's hours?
Call plant for current production and loadout hours: (661) 387-7793. Loadout: Call plant. Production and loadout schedules may vary significantly with weather, seasonal paving demand and high-elevation project schedules. Call ahead to confirm current plant operation, mix availability and truck-loading times.
What asphalt mixes does Granite Construction – Lee Vining Facility make?
Granite Construction – Lee Vining Facility lists Hot Mix Asphalt (HMA), Asphalt Concrete, Type A HMA, RAP-Containing Asphalt Mixes, Reclaimed Asphalt Pavement (RAP), Caltrans Specification Asphalt Mixes and Custom Project-Specific Asphalt Mixes. What runs on a given day depends on the plant's schedule, so confirm your mix when you order.
What areas does Granite Construction – Lee Vining Facility serve?
Granite Construction – Lee Vining Facility serves Lee Vining, Mammoth Lakes, June Lake, Bridgeport, Benton, Crowley Lake, Mono County, Eastern Sierra and Highway 395 Corridor. Haul time still decides whether it can supply a given job, so measure from the site before you order.
Is Granite Construction – Lee Vining Facility Caltrans-approved?
It was on the Caltrans approved-plant list when this record was last checked, on September 29, 2026. Approvals lapse and renew, and a public job still needs its own mix design approved, so confirm both before you bid.
Where is Granite Construction – Lee Vining Facility?
Hwy 120 East, Lee Vining, CA 93541, in Mono County.
What other asphalt plants are near Lee Vining?
The closest by road in this directory is Bishop Facility in Bishop (1 hr 4 min (66 mi) by road), driving from Granite Construction – Lee Vining Facility with typical traffic. Call ahead before you switch plants — the nearest one only helps if it will load your trucks.
Verified sources and corrections
Details checked September 29, 2026
Someone at The Pavement Directory checked this plant’s phone, hours and outside-sales policy against the operator on that date. It is not an endorsement of the plant or its mix.
Sources on this record
- Operator’s page for this plant — graniteconstruction.com
- Operator website — graniteconstruction.com
- Caltrans approved-plant list — Plant listed
Record last updated September 29, 2026.
Plant profile
53% complete
10 of 19 buyer details on file.
Missing
- Site photo
- Account requirements
- Minimum order
- Payment methods
- Saturday production
- Max RAP percentage
- Small loads
- Takes old asphalt
- Millings for sale
Run this plant, or found a detail that has changed? Tell us and we will check it against the operator. Include this page’s address in your message.
Confirm before you haul: Hours, mix availability, sales policy and DOT approvals change, sometimes week to week. Call the plant before you schedule trucks. The Pavement Directory is an independent directory and is not affiliated with Granite Construction Co..